The first thing we had to do was make a driveway. This is a shot as the forest is being cleared. Ralph from Lil Dipper Excavating did a great job.
This part of the driveway extends from the road back about 200 feet to a small ridge that drops approx. 10 ft. The house will be located below the ridge.
Levelling off the stone.
The finished driveway from the street. It has a nice curve to it so you cannot see in to the property from the road (Ralph's idea).