skip to main
|
skip to sidebar
Our next adventure
Thursday, May 10, 2007
2nd Floor
Sometimes you need to have a little fun. Ralph put the office on top of the shipping container. Tim is in the office reading the blueprints
The back wall is framed.
Gettine ready for the ridge beam to be installed.
Here comes the crane to do some serious lifting.
Dropping the ridge beam in place.
These are beams for the garage.
Roof trusses for the garage.
Sunday, May 6, 2007
Backfill
It has taken many many tonns of sand, but it is starting to look good around the house.
Ralph's new toy hard at work.
Piping installed to control the water around the house.
All cleaned up. No more small lakes around the house.
To stop theft of materials from the job site we've install lots of high-tech video serveillance cameras that don't need power.
If that doesn't keep them out, the gate should.
2nd floor
The ceiling joists are in to support the second floor.
The view from our kitchen window.
The tie rods that keep the logs tight.
The sheathing for the 2nd floor is installed.
The opening in the floor is in the great room that is open to the upstairs.
Garage and water
With the logs done, they got started on the garage.
Before they could go too far on the backfill, the waterline from the well had to be run to the house.
Our first service to the house.
Filling the garage
It took a large crew and alot of stone to fill the garage, but they got it done in a day. I heard the crew slept well that night.
They filled it one block at a time and tamped it.
All done, ready for concrete.
Logs are done!
The crew made great progress on the logs and finished it in no time. This is the east face of the house.
This is the west side.
The north face the the garage
Newer Posts
Older Posts
Home
Subscribe to:
Comments (Atom)
Blog Archive
►
2008
(20)
►
09/28 - 10/05
(1)
►
08/31 - 09/07
(5)
►
05/11 - 05/18
(1)
►
05/04 - 05/11
(2)
►
04/20 - 04/27
(2)
►
04/06 - 04/13
(1)
►
03/16 - 03/23
(1)
►
03/09 - 03/16
(1)
►
03/02 - 03/09
(1)
►
02/24 - 03/02
(1)
►
02/10 - 02/17
(1)
►
01/27 - 02/03
(1)
►
01/13 - 01/20
(1)
►
01/06 - 01/13
(1)
▼
2007
(70)
►
12/23 - 12/30
(1)
►
12/16 - 12/23
(2)
►
12/09 - 12/16
(1)
►
12/02 - 12/09
(1)
►
11/25 - 12/02
(2)
►
11/11 - 11/18
(1)
►
10/28 - 11/04
(1)
►
09/30 - 10/07
(1)
►
09/23 - 09/30
(1)
►
09/16 - 09/23
(1)
►
08/26 - 09/02
(2)
►
08/19 - 08/26
(2)
►
08/12 - 08/19
(5)
►
08/05 - 08/12
(1)
►
07/29 - 08/05
(1)
►
07/22 - 07/29
(3)
►
07/15 - 07/22
(3)
►
07/08 - 07/15
(2)
►
06/17 - 06/24
(2)
►
06/10 - 06/17
(2)
►
06/03 - 06/10
(1)
►
05/27 - 06/03
(2)
►
05/20 - 05/27
(2)
►
05/13 - 05/20
(1)
▼
05/06 - 05/13
(6)
2nd Floor
Backfill
2nd floor
Garage and water
Filling the garage
Logs are done!
►
04/22 - 04/29
(3)
►
04/15 - 04/22
(3)
►
04/01 - 04/08
(5)
►
03/11 - 03/18
(2)
►
03/04 - 03/11
(1)
►
02/04 - 02/11
(8)
►
01/28 - 02/04
(1)
About Me
Ken Horner
View my complete profile