

The two dormers still need to be framed in.



The garage floor is now poured. It is so smooth I won't want to drive on it. Frank did a great job.

A look inside the home.


A shot upstairs. The ceilings will be nice and high.


Inspector Oma on the job making sure things are done right!
No comments:
Post a Comment